SAP ABAP Data Element EVENT_CHECK_CB (Chk compl status in event tabl from Cutback)
Hierarchy
☛
EA-FIN (Software Component) EA-FIN
⤷
CA-JVA (Application Component) Joint Venture und Production Sharing Accounting
⤷
GJVB (Package) Joint venture billing

⤷

⤷

Basic Data
Data Element | EVENT_CHECK_CB |
Short Description | Chk compl status in event tabl from Cutback |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | FLAG | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | CBEVENTCHK |
Medium | 15 | CBEVENTCHK |
Long | 20 | CBEVENTCHK |
Heading | 43 | Chk compl status in event tabl from Cutback |
Documentation
Definition
This check box is used to do a check to see if the cutback is marked complete in the event table,T8JEV.
There are several status when Cutback was run.
*& 1 Complete
*& 2 Incomplete
*& 3 Failed
Only if the status is 1 the billing transactions gj12,gj13 should
process the data from Ledger 4A, 4F and 4B, 4D.
If using multiple company code and different status then there is
no error message to stop the complete process but in the error pop up
where you can see the company code which have status 2 or 3.
If processing one company code which has an incorrect status the
program will exit.
Use
Dependencies
Example
Please see Event Table T8JEV Process CBIM for company code, year, period. The cutback run correctly for this company code, the billing process can run.
History
Last changed by/on | SAP | 20130529 |
SAP Release Created in |