SAP ABAP Data Element ENDPRIO (Priority of Period-End Billing)
Hierarchy
☛
IS-UT (Software Component) SAP Utilities/Telecommunication
⤷
IS-U-DM-MR (Application Component) Meter Reading
⤷
EE16 (Package) IS-U: Meter Reading Order Creation
⤷
⤷
Basic Data
| Data Element | ENDPRIO |
| Short Description | Priority of Period-End Billing |
Data Type
| Category of Dictionary Type | D | Domain |
| Type of Object Referenced | No Information | |
| Domain / Name of Reference Type | KENNZX | |
| Data Type | CHAR | Character String |
| Length | 1 | |
| Decimal Places | 0 | |
| Output Length | 1 | |
| Value Table |
Further Characteristics
| Search Help: Name | ||
| Search Help: Parameters | ||
| Parameter ID | ||
| Default Component name | ||
| Change document | ||
| No Input History | ||
| Basic direction is set to LTR | ||
| No BIDI Filtering |
Field Label
| Length | Field Label | |
| Short | 10 | PEB prio. |
| Medium | 15 | PEB priority |
| Long | 20 | PEB priority |
| Heading | 2 | P |
Documentation
Definition
When you mark this field, then a period-end billing order has priority over other orders. If an additional billing order with a different billing operation (periodic, interim, and so on) exists for the same contract, it cannot be processed after the period-end billing order.
- If the indicator is not set, the period-end billing order has no priority. A periodic billing order can be processed before the period-end billing order (both orders are for the same contract). In this way, you can prevent the next periodic billing from being missed because of a delayed execution of period-end billing.
Dependencies
This indicator is only relevant for rate categories with period-end billing.
History
| Last changed by/on | SAP | 20050224 |
| SAP Release Created in |