SAP ABAP Data Element EHSWAE_MNDIVTOT (Total Quantity Is Distributed Between the Waste Items)
Hierarchy
☛
EA-APPL (Software Component) SAP Enterprise Extension PLM, SCM, Financials
⤷ EHS-WA (Application Component) Waste Management
⤷ CBWA (Package) EH&S: Waste Management
⤷ EHS-WA (Application Component) Waste Management
⤷ CBWA (Package) EH&S: Waste Management
Basic Data
Data Element | EHSWAE_MNDIVTOT |
Short Description | Total Quantity Is Distributed Between the Waste Items |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | X | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 8 | Split |
Medium | 20 | Split total quantity |
Long | 20 | Split total quantity |
Heading | 0 |
Documentation
Definition
Indicates that a total quantity entered is distributed between the individual items. Depending on the type of total quantity, it is distributed as follows:
- A total outgoing quantity is distributed between all the wastes entered in equal proportions.
- A total quantity disposed of is distributed according to the quantities that you specified as outgoing quantities for the wastes entered.
Use
Procedure
Examples
Dependencies
Note the following dependencies when you set the Calculate total quantity and Split total quantity indicators:
- The system adds up or distributes quantities whenever you have made and confirm a change. The system takes into account whether the item values or the total values have changed. This means that if you have set the Calculate total quantity indicator and subsequently change a calculated total, it is not recalculated. If, on the other hand, you change the item values, the total is recalculated and corrected. If you have set both indicators, the following dependencies apply:
- If you change an item value, the system recalculates the total value and overwrites the existing total value.
- If you change a total value, the system distributes this value between the items and overwrites the existing item values.
- If you enter values in the item fields and in the total field and only then confirm them, the entries for the waste items have priority. This means that if you have set both indicators and the total of the item values entered does not correspond to the total entered, the total is recalculated from the item values and corrected. The item values entered and therefore the distribution remain unchanged.
History
Last changed by/on | SAP | 20011002 |
SAP Release Created in |