Hierarchy
⤷ EHS-WA (Application Component) Waste Management
⤷ CBWA (Package) EH&S: Waste Management
Basic Data
Data Element | EHSWAE_MNDATREC |
Short Description | Return Within |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | NUMC3 | |
Data Type | NUMC | Character string with only digits |
Length | 3 | |
Decimal Places | 0 | |
Output Length | 3 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Rtrn in |
Medium | 20 | Return within |
Long | 20 | Return within |
Heading | 27 | Return dispsl doc. within |
Documentation
Definition
Specifies the period in days within which a disposal document, or a copy of it, must by returned to the waste generator by the waste disposer.
Use
In Germany, the waste approval directive stipulates the periods within which copies of the waste manifest must be returned.
Procedure
The system automatically specifies here the period within which the disposal document must be returned as follows:
- If you entered a period within which the disposal document must be returned in the Waste Management master data for the waste generator involved, it is specified here.
- If you did not enter a period within which the disposal document must be returned in the master data for the waste generator involved, but you did enter a period for the disposal document type in the IMG activity Specify Disposal Document Types in Customizing for Waste Management, it is specified here.
Examples
Dependencies
In the standard checks, the period within which a disposal document must be returned begins on the handover date, in other words on the date that the disposal document was handed over to the first transporter.
Supplementary Documentation - EHSWAE_MNDATREC0001
Use
In Germany, the waste approval directive stipulates the periods within which copies of the waste manifest must be returned.
Note.
You can specify the return period here for the disposal document type or enter the return period for the waste generators involved in the master data for Waste Management. The period entered for the waste generator has priority.
Procedure
Examples
Dependencies
In the standard checks, the period within which a disposal document must be returned begins on the handover date, in other words on the date that the disposal document was handed over to the first transporter.
Supplementary Documentation - EHSWAE_MNDATREC0002
Use
In Germany, the waste approval directive stipulates the periods within which copies of the waste manifest must be returned.
Procedure
You can either enter here for the waste generator the period within which the disposal document must be returned or stipulate a period for the disposal document type in the IMG activity Specify Disposal Document Types in Customizing for Waste Management. The period entered for the waste generator has priority here.
Note:
However, the period within which a disposal document must be returned that you enter here is only taken into account for a disposal document if the validity area specified here for the period matches the validity area that you specified for the disposal document type in Customizing.
Examples
Dependencies
In the standard checks, the period within which a disposal document must be returned begins on the handover date, in other words on the date that the disposal document was handed over to the first transporter.
History
Last changed by/on | SAP | 20011002 |
SAP Release Created in |