Hierarchy
⤷ EHS-WA (Application Component) Waste Management
⤷ CBWA (Package) EH&S: Waste Management
Basic Data
Data Element | EHSWAE_CHKCOOBJ |
Short Description | Object Checked as Account Assignment Object for Assignment |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | XFELD | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Check |
Medium | 15 | Check AA obj. |
Long | 20 | Check acct ass. obj. |
Heading | 1 | C |
Documentation
Definition
Indicates that the checks that are also run for account asssignment objects in the Controlling (CO) component are run automatically when objects of this object type are assigned to waste management business partners.
Use
In the master data for Waste Management, you can specify integration objects that are also account assignment objects under Assignment to (integration). If you set this indicator, the account assignment objects are checked for this assignment in the master data. You can thus ensure that only valid account assignment objects are assigned to the waste management business partners.
Caution:
Only set this indicator for object types whose objects can also be used as account assignment objects in the SAP System (for example, cost centers and orders).
Note:
In the master data, the checks for account assignment objects are also run generally under account assignment in the account assignment block. You do not need to set this indicator for these checks to be run.
Procedure
Examples
Dependencies
- In order for an account assignment object to be able to be checked, you must specify a company code and a key date. These are queried after the account assignment object has been entered if the object has to be checked.
- If you set this indicator, you must also set the Account assignment object indicator.
History
Last changed by/on | SAP | 20011002 |
SAP Release Created in |