Hierarchy
⤷ EHS-WA (Application Component) Waste Management
⤷ CBWA (Package) EH&S: Waste Management
Basic Data
Data Element | EHSWAE_BATACT |
Short Description | Batch Management for Waste Management Active |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | XFELD | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Batch actv |
Medium | 15 | Batch mgmt actv |
Long | 23 | Batch management active |
Heading | 0 |
Documentation
Definition
Indicates that the Batch field in disposal processing for Waste Management is ready for input.
Use
Procedure
Set this indicator if you want to work with batches in Waste Management.
Note:
If you only want to specify a charge for the original material in the Orig.Batch field in disposal processing, you do not have to set this indicator. The Orig.Batch field is still ready for input.
Examples
Dependencies
If the indicator is set, you can specify a batch for a waste in the entry document in disposal processing. The batch can then be included or can be created again, for example, for stock posting if you choose a function in the application toolbar in disposal processing. A prerequisite for this is that the material corresponding to the waste is managed in batches.
When a batch is created, only a batch master record is created. Values can only be assigned to the batch created in the material master and not from Waste Management.
History
Last changed by/on | SAP | 20011002 |
SAP Release Created in |