SAP ABAP Data Element EHSWAE_APAMTOAM (No Quantity Check)
Hierarchy
EA-APPL (Software Component) SAP Enterprise Extension PLM, SCM, Financials
   EHS-WA (Application Component) Waste Management
     CBWA (Package) EH&S: Waste Management
Basic Data
Data Element EHSWAE_APAMTOAM
Short Description No Quantity Check  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type X    
Data Type CHAR   Character String 
Length 1    
Decimal Places 0    
Output Length 1    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 No Check 
Medium 15 No Check 
Long 20 No Quantity Check 
Heading 20 No Quantity Check 
Documentation

Definition

Identifies the data records for which no quantity monitoring is to be carried out.

Set this indicator for quantities that you enter for information only do not need to be monitored.

Procedure

Examples

In Germany, authorities can approve waste quantities for various time periods:

  • You can approve the total quantity of up to five annual quantities.
  • You can approve the annual quantities individually.
  • You can approve the total quantity of up to five annual quantities and the annual quantities individually.

Correspondingly, it is necessary to monitor that the total quantity and the individual annual quantities are not exceeded.

Dependencies

You can set up your system to ensure that the quantities of waste specified in the waste approval are adhered to.

In Customizing for Waste Management in the IMG activity Specify Disposal Document Types, you can specify a function module that writes the waste quantity in the Quantity disposed of field from the quantities actually disposed of that were specified in the disposal documents. The standard function module outputs a message when the quantity specified in the Alert quantity is reached. The checks required for this are run for all quantities that fulfill the following criteria:

  • The key date for the check lies within the period defined by the Valid from and Valid to fields.
  • The No check indicator has not been set for the quantity.

Note:

The Period field is not taken into account during these checks.

History
Last changed by/on SAP  20100310 
SAP Release Created in