SAP ABAP Data Element EHS00_SRV_PCLT (Planned Examination Date)
Hierarchy
☛
EA-APPL (Software Component) SAP Enterprise Extension PLM, SCM, Financials
⤷
EHS-HEA (Application Component) Occupational Health
⤷
P99Q1 (Package) EH&S: Occupational Health

⤷

⤷

Basic Data
Data Element | EHS00_SRV_PCLT |
Short Description | Planned Examination Date |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | DATUM | |
Data Type | DATS | Date field (YYYYMMDD) stored as char(8) |
Length | 8 | |
Decimal Places | 0 | |
Output Length | 10 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Date |
Medium | 15 | Planned date |
Long | 20 | Planned date |
Heading | 20 | Planned date |
Documentation
Definition
Indicates the date planned for the health surveillance protocol on the basis of the specified periods.
When you open a medical service, the date specified as next due becomes the planned examination date. The system then uses this planned date to calculate the next due date for the next protocol on the basis of the specified periods (see also: Next Due).
Use
Procedure
Examples
Dependencies
History
Last changed by/on | SAP | 20020125 |
SAP Release Created in |