SAP ABAP Data Element ECAC (Updated overall costs)
Hierarchy
☛
BBPCRM (Software Component) BBPCRM
⤷
PS-COS-PLN-CAL (Application Component) Costing
⤷
KPKA (Package) Projects: Costing networks
⤷
⤷
Basic Data
| Data Element | ECAC |
| Short Description | Updated overall costs |
Data Type
| Category of Dictionary Type | D | Domain |
| Type of Object Referenced | No Information | |
| Domain / Name of Reference Type | WERTV8 | |
| Data Type | CURR | Currency field, stored as DEC |
| Length | 15 | |
| Decimal Places | 2 | |
| Output Length | 21 | |
| Value Table |
Further Characteristics
| Search Help: Name | ||
| Search Help: Parameters | ||
| Parameter ID | ||
| Default Component name | ||
| Change document | ||
| No Input History | ||
| Basic direction is set to LTR | ||
| No BIDI Filtering |
Field Label
| Length | Field Label | |
| Short | 10 | Ovrll csts |
| Medium | 17 | Updtd ovrll costs |
| Long | 26 | Updated overall costs |
| Heading | 0 |
Documentation
Definition
The updated total costs are the total forecast costs for an object. They are calculated by adding the total of actual costs, commitments, and the updated residual costs.
History
| Last changed by/on | SAP | 19980706 |
| SAP Release Created in |