SAP ABAP Data Element EABR_NACHL (IS-M: Time of Final Settlement After Runtime (in Months))
Hierarchy
☛
IS-M (Software Component) SAP MEDIA
⤷
IS-M (Application Component) SAP Media
⤷
JAS (Package) Application development R/3 Publishing Advertising System***
⤷
⤷
Basic Data
| Data Element | EABR_NACHL |
| Short Description | IS-M: Time of Final Settlement After Runtime (in Months) |
Data Type
| Category of Dictionary Type | D | Domain |
| Type of Object Referenced | No Information | |
| Domain / Name of Reference Type | SYNUM02 | |
| Data Type | NUMC | Character string with only digits |
| Length | 2 | |
| Decimal Places | 0 | |
| Output Length | 2 | |
| Value Table |
Further Characteristics
| Search Help: Name | ||
| Search Help: Parameters | ||
| Parameter ID | ||
| Default Component name | CONTRACT_STL_WAITING_PERIOD | |
| Change document | ||
| No Input History | ||
| Basic direction is set to LTR | ||
| No BIDI Filtering |
Field Label
| Length | Field Label | |
| Short | 10 | Sub.Per. |
| Medium | 20 | Sub Per.f.Fin.Sett |
| Long | 40 | Subsequent Period for Final Settlement |
| Heading | 4 | Aftr |
Documentation
Definition
Subsequent period in months for final settlement.
Procedure
Maintain the time offset (in months) from the end of the contract validity period after which point final settlement should be performed automatically for a contract.
History
| Last changed by/on | SAP | 20050224 |
| SAP Release Created in |