SAP ABAP Data Element DTVTA_012D (Lead Days for Date of Execution)
Hierarchy
SAP_FIN (Software Component) SAP_FIN
   FI-BL-PT (Application Component) Payment Transactions
     BFIBL_CHECK_D (Package) Payment : General Section
Basic Data
Data Element DTVTA_012D
Short Description Lead Days for Date of Execution  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type NUMC02    
Data Type NUMC   Character string with only digits 
Length 2    
Decimal Places 0    
Output Length 2    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 Leader 
Medium 15 Lead Days 
Long 33 Lead Days for Date of Execution 
Heading 33 Lead Days for Date of Execution 
Documentation

Use Germany

With foreign data medium exchange, by specifying up to 15 lead days, you can control the number of days between the creation date and the run date entered in the header record (field Q8), and between the due date and the run date entered in the single data record (field T5).

Use Austria

The lead days specification is also used in Austria for foreign payment transactions (paper and DME), if the run date is not specified as part of the program parameters.

History
Last changed by/on SAP  20011120 
SAP Release Created in