SAP ABAP Data Element DI_ESD_HM (Second Checking Horizon)
Hierarchy
☛
ECC-DIMP (Software Component) DIMP
⤷ SD-SLS-OA-SCH (Application Component) Customer Scheduling Agreement
⤷ DI_ESD_TOL (Package) DI 3.0 Project ESD Tolerance Check
⤷ SD-SLS-OA-SCH (Application Component) Customer Scheduling Agreement
⤷ DI_ESD_TOL (Package) DI 3.0 Project ESD Tolerance Check
Basic Data
Data Element | DI_ESD_HM |
Short Description | Second Checking Horizon |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | DI_ESD_HO | |
Data Type | NUMC | Character string with only digits |
Length | 4 | |
Decimal Places | 0 | |
Output Length | 4 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | 2ndChk.Hor |
Medium | 15 | 2nd Check. Hor. |
Long | 22 | Second Checking Hor. |
Heading | 22 | Second Checking Hor. |
Documentation
Definition
Number of days in the mid-term horizon. The period checked is the mid-term horizon minus the short-term horizon.
Use
Dependencies
Example
The mid-term horizon is 10 days long and the short-term horizon is 5 days long. The period checked is then 5 days long, that is the difference between the mid-term horizon and the short-term horizon.
History
Last changed by/on | SAP | 20050301 |
SAP Release Created in | 46C2 |