Hierarchy
⤷ PA-PA (Application Component) Personnel Administration
⤷ PBAS (Package) SAP HR Master Data Application Development
Basic Data
Data Element | DAVO |
Short Description | Default start date |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | DAVO | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | C.w/o strt |
Medium | 15 | Create w/o strt |
Long | 20 | Create w/o st. date |
Heading | 2 | DD |
Documentation
Definition
If you do not enter a start date on the selection screen when creating a record, the system sets a default date according to the value you enter in this field.
' ': The system does not set a default value. Exceptions are described in the respective infotype documentation.
'1': If no record exists, the date of entry is the default; otherwise the initial value is used.
'2': Start date of the current organizational assignment.
'3': CPU date.
Please note that you can only use the 'Create' function to enter
records for the 'Actions', 'Organizational Assignment' and 'Personal
Data' infotypes once.
If a record already exists, the system automatically switches from
'Create' to 'Copy'. The start date can either be preset in the
action or entered explicitly on the infotype entry screen.
History
Last changed by/on | SAP | 19980218 |
SAP Release Created in |