SAP ABAP Data Element CY_DSTRBW (Distribute work to first/last day of the period)
Hierarchy
☛
SAP_APPL (Software Component) Logistics and Accounting
⤷ PS-CRP-WFP (Application Component) Workforce Planning
⤷ CYMP (Package) Workforce Planning
⤷ PS-CRP-WFP (Application Component) Workforce Planning
⤷ CYMP (Package) Workforce Planning
Basic Data
Data Element | CY_DSTRBW |
Short Description | Distribute work to first/last day of the period |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | KREUZ | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Per. start |
Medium | 15 | Period start |
Long | 25 | Work to period start |
Heading | 0 |
Documentation
Definition
This indicator determines the way work is distributed during disaggregtion to a day-to-day basis.
If you chose a planning period of more than a day, then the data entered will be disaggregated when you save the data or when you switch to a daily time basis. There are two ways of doing this:
- If you select the indicator, all the work will be dispatched to the first day in the period.
- If you do not set the indicator, all the work wil be dispatched to the last day in the period.
Note
If you select the indicator, then the work will be dispatched during scheduling to the first day of the split in the period.
History
Last changed by/on | SAP | 19980525 |
SAP Release Created in |