SAP ABAP Data Element CURTO_EXT_CHECK (Execute Extended Consistency Check)
Hierarchy
SAP_APPL (Software Component) Logistics and Accounting
   LO-VC-LOI (Application Component) LO Integration
     CURTO (Package) Create Runtime Object for APO
Basic Data
Data Element CURTO_EXT_CHECK
Short Description Execute Extended Consistency Check  
Data Type
Category of Dictionary Type     Direct Type Entry
Type of Object Referenced     No Information
Domain / Name of Reference Type      
Data Type CHAR   Character String 
Length 1    
Decimal Places 0    
Output Length 1    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 Extd Check 
Medium 18 Extended Check 
Long 28 Extended Consistency Check 
Heading  
Documentation

Definition

Activates the extended consistency check for a production data structure (PDS).

Use

You should only activate the extended consistency check in special circumstances, such as for incorrect production data structures or incorrect orders in SAP SCM.

The extended consistency check is used to check if the PDS meets certain conditions. The system issues an error messages if one of the following conditions has not been met:

  • Only one resource is always specified as the calendar resource at the mode
  • The activity relationships are consistent (warning message only)
  • Different primary resources are assigned to the different modes of an activity
  • Mode linkage is carried out via the primary resource in an operation
  • The Continuous Resource Load indicator has not been set for relationships between the activities of different operations
  • Only one dynamic setup activity exists in an operation
  • All activities have the same mode (warning message only)
  • No preceding activity exists before a dynamic setup activity in an operation
  • The activities of an operation are linked via end-start relationships
  • The same primary resource is assigned to the activities of an operation
  • The header product of the PDS cannot be the component for this product (recursion)

Dependencies

The extended consistency check can lead to poor system performance. Only activate the check if one of the situations described above occurs.

Example

History
Last changed by/on SAP  20050411 
SAP Release Created in 2005_1_470