SAP ABAP Data Element COWB_210_CTRL_BOM_REREAD (Reread Bill of Material)
Hierarchy
☛
SAP_APPL (Software Component) Logistics and Accounting
⤷ PP-SFC (Application Component) Production Orders
⤷ COWB (Package) PP Workbench
⤷ PP-SFC (Application Component) Production Orders
⤷ COWB (Package) PP Workbench
Basic Data
Data Element | COWB_210_CTRL_BOM_REREAD |
Short Description | Reread Bill of Material |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | COWB_210_CTRL_BOM_REREAD | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ORDER_CATG | |
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | BOM |
Medium | 15 | Reread BOM |
Long | 20 | Reread BOM |
Heading | 20 | Reread BOM |
Documentation
Definition
Controls whether the BOM is reread when planned order conversion is carried out.
Description
After the planned order has been converted, the system can automatically reread the BOM in the newly created production order, before the order is posted.
The values have the following meanings:
- Yes
The BOM is reread. For collective orders, the system rereads the BOM for the leading order resulting in a new explosion of the collective order. - No
The BOM is not reread. The BOM items of the planned order are transferred to the production order.
History
Last changed by/on | SAP | 20041209 |
SAP Release Created in | 600 |