SAP ABAP Data Element CONVERTER_CONV_START_TIME (Earliest start time for conversion)
Hierarchy
☛
SAP_APPL (Software Component) Logistics and Accounting
⤷
LO-PDM (Application Component) Product Data Management
⤷
CONV (Package) Conversion of original application files
⤷
⤷
Basic Data
| Data Element | CONVERTER_CONV_START_TIME |
| Short Description | Earliest start time for conversion |
Data Type
| Category of Dictionary Type | Direct Type Entry | |
| Type of Object Referenced | No Information | |
| Domain / Name of Reference Type | ||
| Data Type | TIMS | Time field (hhmmss), stored as char(6) |
| Length | 6 | |
| Decimal Places | 0 | |
| Output Length | 8 | |
| Value Table |
Further Characteristics
| Search Help: Name | ||
| Search Help: Parameters | ||
| Parameter ID | ||
| Default Component name | ||
| Change document | ||
| No Input History | ||
| Basic direction is set to LTR | ||
| No BIDI Filtering |
Field Label
| Length | Field Label | |
| Short | 10 | Start time |
| Medium | 18 | Earlist start time |
| Long | 20 | Earliest start time |
| Heading | 9 | StartTime |
Documentation
Definition
Set the time when the conversion job will be run.
Dependencies
The time you enter is for the day when the job was started.
You can also set a time period in which the conversion will start.
When you enter a Start delay the job is started during a randomly selected time during the time period.
Example
You want conversions to take place between 6:00 PM (18:00) and 6:00 AM (6:00).
Enter the following data:
Earliest start time: 6:00.00 pm (18:00.00)
Delay in start: 12:00.00 (hours)
Notes
- If you want the job to start immediately do not enter a time.
- If you enter an ealriest start time, do not make the Delayin start too short because then too many conversions well bog the converter down and cause long wait periods.
History
| Last changed by/on | SAP | 19991014 |
| SAP Release Created in |