SAP ABAP Data Element COCF_SN_INCIDENT_RELEND_FUTURE (Earliest Event End: Days or Hours in the Future)
Hierarchy
☛
EA-APPL (Software Component) SAP Enterprise Extension PLM, SCM, Financials
⤷
PP-SFC (Application Component) Production Orders
⤷
COCF (Package) Order and Confirmation Data
⤷
⤷
Basic Data
| Data Element | COCF_SN_INCIDENT_RELEND_FUTURE |
| Short Description | Earliest Event End: Days or Hours in the Future |
Data Type
| Category of Dictionary Type | Direct Type Entry | |
| Type of Object Referenced | No Information | |
| Domain / Name of Reference Type | ||
| Data Type | NUMC | Character string with only digits |
| Length | 4 | |
| Decimal Places | 0 | |
| Output Length | 4 | |
| Value Table |
Further Characteristics
| Search Help: Name | ||
| Search Help: Parameters | ||
| Parameter ID | ||
| Default Component name | ||
| Change document | ||
| No Input History | ||
| Basic direction is set to LTR | ||
| No BIDI Filtering |
Field Label
| Length | Field Label | |
| Short | 10 | End |
| Medium | 20 | Event End in Future |
| Long | 30 | Earliest Event End in Future |
| Heading | 40 | Earliest Event End in the Future |
Documentation
Definition
Specifies the point in time after which a shift that began in the past must end in order for it to be regarded as a long-runner.
Use
Enter the number of days or hours in the future as a positive figure.
Hinweis
Open-ended shift notes are always regarded as long-runners.
Dependencies
Example
- If you specify 0 days, all shift notes that end in the future are regarded as long-runners.
- If you specify 1 day, all shift notes that end tomorrow after 0 hrs are regarded as long-runners.
- If you enter 5 hours and the current clock time is 10 hrs, all shift notes that end after 15 hrs today are regarded as long-runners.
History
| Last changed by/on | SAP | 20110901 |
| SAP Release Created in | 605 |