SAP ABAP Data Element CO_WKGIV (Allocated Actual Costs)
Hierarchy
☛
SAP_FIN (Software Component) SAP_FIN
⤷ CO-OM-ACT (Application Component) Activity Types
⤷ KABW (Package) Cost Accounting: Variance Calculation
⤷ CO-OM-ACT (Application Component) Activity Types
⤷ KABW (Package) Cost Accounting: Variance Calculation
Basic Data
Data Element | CO_WKGIV |
Short Description | Allocated Actual Costs |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | WERTV8 | |
Data Type | CURR | Currency field, stored as DEC |
Length | 15 | |
Decimal Places | 2 | |
Output Length | 21 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Alloc Actl |
Medium | 15 | Allocated Actl |
Long | 20 | Allocated Actl Costs |
Heading | 21 | Allocated Actl Costs |
Documentation
Definition
Specifies the costs with which the object is credited. When the variances are calculated, these costs are compared with the target costs to calculate the variance categories on the output side.
- In Overhead Cost Controlling, these costs are the actual credits from activity allocations.
- In Cost Object Controlling, these costs include the actual credits from deliveries to stock.
History
Last changed by/on | SAP | 19950401 |
SAP Release Created in |