SAP ABAP Data Element CO_LSTWG (Target=Actual Allocation: Total Actual Activity)
Hierarchy
SAP_FIN (Software Component) SAP_FIN
   CO-OM-ACT (Application Component) Activity Types
     KACT (Package) CO-OM-ACT: Performance Analysis
Basic Data
Data Element CO_LSTWG
Short Description Target=Actual Allocation: Total Actual Activity  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type MENGV8    
Data Type QUAN   Quantity field, points to a unit field with format UNIT 
Length 15    
Decimal Places 3    
Output Length 20    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 Tot. acty 
Medium 15 Actual Activity 
Long 20 Total actual acty 
Heading 20 Total actual acty 
Documentation

Definition

Actual activity quantity is calculated in target-to-actual allocation by using the plan activity quantities and the operating rates of the receiving cost centers/activity types. Plan activity quantity is the basis for target-to-actual allocation, and is adjusted to the operating rates of the receiver in order to be updated as actual activity.

The method is iterative and therefore can process indirect activity network relationships as well.

Only activity types of activity type category 5 are adjusted.

History
Last changed by/on SAP  19960725 
SAP Release Created in