SAP ABAP Data Element CNVA_00555_STEP (Step Number for Execution of Parallel Background Jobs)
Hierarchy
☛
DMIS (Software Component) DMIS 2011_1
⤷ CA-EUR (Application Component) European Monetary Union: Euro
⤷ CNVA_00555 (Package) Chart of Accounts : Runtime Estimation
⤷ CA-EUR (Application Component) European Monetary Union: Euro
⤷ CNVA_00555 (Package) Chart of Accounts : Runtime Estimation
Basic Data
Data Element | CNVA_00555_STEP |
Short Description | Step Number for Execution of Parallel Background Jobs |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | INT4 | |
Data Type | INT4 | 4-byte integer, integer number with sign |
Length | 10 | |
Decimal Places | 0 | |
Output Length | 10 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Step No. |
Medium | 15 | Step No. |
Long | 20 | Step Number |
Heading | 10 | Step No. |
Documentation
Definition
Indicates the step at which a specified number of parallel background jobs are scheduled.
Use
Dependencies
Example
For a PCL Package ID, two jobs are scheduled for the first step and four jobs are scheduled for the second step.
This field displays 1 for the two jobs scheduled in the first step and 2 for the four jobs scheduled in the second step.
History
Last changed by/on | SAP | 20141029 |
SAP Release Created in | 2006_1_46C |