SAP ABAP Data Element CNV_PARTASKS (Maximum number of parallel tasks running simultaneously)
Hierarchy
DMIS (Software Component) DMIS 2011_1
   CA-GTF-BS (Application Component) Business Application Support
     CNV_BASIS (Package) Conversion: Basis functions
Basic Data
Data Element CNV_PARTASKS
Short Description Maximum number of parallel tasks running simultaneously  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type NUMC2    
Data Type NUMC   Character string with only digits 
Length 2    
Decimal Places 0    
Output Length 2    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 Max. proc. 
Medium 15 Max. processes 
Long 22 Max. processes running 
Heading 22 Max. processes running 
Documentation

Definition

Maximum number of parallel update tasks per table that are running simultaneously

Use

In some situations it may make sense to create M parallel update tasks per table but to execute N tasks simultaneously.

Dependencies

This parameter should be always smaller or equal to the maximum number of parallel update tasks per table (see Maximum number of parallel update tasks)

Example

History
Last changed by/on SAP  20141029 
SAP Release Created in 2006_1_46C