Hierarchy
⤷ CA-EUR (Application Component) European Monetary Union: Euro
⤷ CNV_20306 (Package) Controlling area (KOKRS) rename
Basic Data
Data Element | CNV_20306_COABC |
Short Description | Activity-Based Costing Active |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | CNV_20306_RKAC3 | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | BusProcess |
Medium | 15 | Bus. processes |
Long | 20 | Acty-Based Cstg |
Heading | 2 | BP |
Documentation
Definition
Indicator controlling whether the Activity-Based Costing component (CO-OM-ABC) is active or not.
Use
The following values are valid for Activity-Based Costing:
Component not active
ABC is inactive. Validation of business processes does not take place. They cannot be used as account assignment objects.
Component active for parallel calculation
ABC is active, but may be used only as a parallel calculation. All allocations are not posted as "real" debit/credits, but as statistical postings along the lines of the delta version for Activity-Based Costing.
Component active for parallel and operational calculation
ABC is active without restrictions. Business processes are validated using the business process master record and used as account assignment objects. During allocations, the participating objects are debited and credited as "real" and updated with the corresponding posting transactions.
It is still possible to use allocations based on the concepts of the Activity-Based Costing Delta Version.
History
Last changed by/on | SAP | 20141030 |
SAP Release Created in | 46C |