SAP ABAP Data Element CMX_XSR_CALC_VERS_DATE_TO (Automatic Calculation of Valid-To Date of SXS Version)
Hierarchy
☛
EA-APPL (Software Component) SAP Enterprise Extension PLM, SCM, Financials
⤷
PP-PI-PMA (Application Component) Process Management
⤷
CMX_XSR (Package) XSteps: Standard Repositories

⤷

⤷

Basic Data
Data Element | CMX_XSR_CALC_VERS_DATE_TO |
Short Description | Automatic Calculation of Valid-To Date of SXS Version |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | XFELD | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 0 | |
Medium | 0 | |
Long | 40 | SXS Vers.: Calculation of Valid-To Date |
Heading | 0 |
Documentation
Definition
Indicator via which you can specify that the valid-to date of standard XStep versions is calculated by the system.
Use
If you set the indicator, you cannot specify a valid-to date when creating a new standard XStep version. The field is not ready to accept input.
The valid-to date is calculated automatically by the system.
When you release a version of an SXS, the system checks that there is only one version with the status released or released for test at that time.
Dependencies
Example
History
Last changed by/on | SAP | 20060711 |
SAP Release Created in | 606 |