SAP ABAP Data Element CMPMVD_CONF_PS (Reassign component if target activity confirmed)
Hierarchy
☛
SAP_APPL (Software Component) Logistics and Accounting
⤷
PS-CON (Application Component) Confirmation
⤷
CN_CONFIRM (Package) PS Confirmation

⤷

⤷

Basic Data
Data Element | CMPMVD_CONF_PS |
Short Description | Reassign component if target activity confirmed |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | OCM_CONFLICT | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Act.conf. |
Medium | 20 | TargAct confirmed |
Long | 35 | Reassign: Target act. confirmed |
Heading | 10 | Act.conf. |
Documentation
Definition
Indicator that determines how moving a component in a confirmed activity is treated by configuration changeanagement for networks.
Use
This indicator is valid in order change management for a change profile.
You use this indicator to decide whether the above-named action represents a conflict and whether the conflict is an information message, a warning or an error.
History
Last changed by/on | SAP | 19980525 |
SAP Release Created in |