SAP ABAP Data Element CLOISCHGRP (Grouping for Shift Definitions and Shift Sequences)
Hierarchy
☛
SAP_APPL (Software Component) Logistics and Accounting
⤷ LO-SCI-POI (Application Component) Production Optimization Interface (POI)
⤷ CLOI (Package) for logistics optimization interface
⤷ LO-SCI-POI (Application Component) Production Optimization Interface (POI)
⤷ CLOI (Package) for logistics optimization interface
Basic Data
Data Element | CLOISCHGRP |
Short Description | Grouping for Shift Definitions and Shift Sequences |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | SCHGRUP | |
Data Type | CHAR | Character String |
Length | 2 | |
Decimal Places | 0 | |
Output Length | 2 | |
Value Table | TC39A |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Grouping |
Medium | 15 | Grouping |
Long | 20 | Shift Grouping |
Heading | 5 | Grpg |
Documentation
Definition
Number that identifies a grouping.
Use
You can create and select shift sequences and shift definitions for special areas (for example, different plants or different areas within a plant) with the help of a grouping.
Groupings 51 to 99 are to be set aside for Logistics, groupings 1 to 50 for personnel management.
Dependencies
If you have entered a grouping, only those shift sequences and shift definitions will be brought up for available capacity maintenance that have been assigned to that particular grouping in Customizing.
If you haven't entered a grouping, the system will bring up the shift sequences and shift definitions that have been maintained for grouping 1.
History
Last changed by/on | SAP | 20130529 |
SAP Release Created in |