SAP ABAP Data Element CKMLBB_SCHEMA (Key Figure Scheme in Material Ledger)
Hierarchy
☛
SAP_FIN (Software Component) SAP_FIN
⤷ CO-PC-ACT (Application Component) Actual Costing/Material Ledger
⤷ CKMLBB (Package) Balance Sheet Valuation in Material Ledger
⤷ CO-PC-ACT (Application Component) Actual Costing/Material Ledger
⤷ CKMLBB (Package) Balance Sheet Valuation in Material Ledger
Basic Data
Data Element | CKMLBB_SCHEMA |
Short Description | Key Figure Scheme in Material Ledger |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | CKMLBB_SCHEMA | |
Data Type | CHAR | Character String |
Length | 2 | |
Decimal Places | 0 | |
Output Length | 2 | |
Value Table | CKMLRSCHEMA |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Scheme |
Medium | 15 | ML Scheme |
Long | 31 | Key Figure Scheme in ML |
Heading | 31 | Key Figure Scheme in ML |
Documentation
Definition
Schema that is used to calculate values in the material ledger.
Use
You set in this schema which transactions are used to calculate a particular value (for example, receipt value in a period).
You choose the transactions using a combination of category (receipts, other receipts and consumption) and process category (receipt for purchase order, receipt for production order, and so on). When choosing process categories you are allowed to use wildcards ('*').
Dependencies
Example
In calculating the receipt value of a period, all transactions with the category "Receipts" (ZU) and also the postings with Debit/Credit Material transaction (MR22, category VP, process category DC) should be included
You make two entries in the key figure scheme.
- One entry with category ZU and process category '*' (all of the process categories)
- One entry with category VP and process category DC (transaction MR22)
History
Last changed by/on | SAP | 20100310 |
SAP Release Created in | 700 |