Hierarchy
⤷ CO-PC-ACT (Application Component) Actual Costing/Material Ledger
⤷ CKMLRUN (Package) Costing Run in Material Ledger
Basic Data
Data Element | CKML_XALL_MATERIALS |
Short Description | Always Determine Material Prices Again |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | BOOLE | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Det. again |
Medium | 16 | Det.prices again |
Long | 20 | Determine pr. again |
Heading | 2 | DA |
Documentation
Definition
Controls whether all material prices in the valuation area are determined again when repeating material price determination or whether only the prices for materials that were not processed should be determined.
Procedure
Set the indicator 'Process again' if you want to re-determine all material prices.
If you want to settle only those materials that were not settled sucessfully in the last material settlement, set the 'Do not process indicator. The advantage here is that fewer materials are settled.
Recommendations
Single-level material price determination
Set the 'Process again' indicator if you want to repeat single-level price determination (after a sucessful run) with a lower error threshold.
Multi-level material price determination
As a rule, the indicator 'Process again' should be set. Otherwise, multi-level price determination may be performed with errors.
Only set the 'Do not process' indicator if it is certain that for all material prices that are still to be determined, the dependant prices in the quantity structure are also still to be determined.
History
Last changed by/on | SAP | 19990317 |
SAP Release Created in |