SAP ABAP Data Element CKML_MGVLAUPD (Update of Activity Consumption in the Quantity Structure)
Hierarchy
SAP_FIN (Software Component) SAP_FIN
   CO-PC-ACT (Application Component) Actual Costing/Material Ledger
     CKMLLA (Package) Update of Activity Consumption in Quantity Structure
Basic Data
Data Element CKML_MGVLAUPD
Short Description Update of Activity Consumption in the Quantity Structure  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type CKML_MGVLAUPD    
Data Type CHAR   Character String 
Length 1    
Decimal Places 0    
Output Length 1    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 Act.activi 
Medium 17 Actual activities 
Long 40 Actual activities updated 
Heading ActAct 
Documentation

Definition

Setting for updating the consumption of activities and processes in the actual quantity structure. Three different settings are available:

'0' = Update is not active

'1' = Update is active but not relevant to price determination. Consumption is updated in the quantity structure but not taken into account upon price determination.

'2' = Update is active and relevant to price determination. Variances between the activity prices/process prices posted during the period and the actual price at the end of the period are adjusted subsequently.

Consequences

If the update is relevant for price determination in a plant, all allocations to orders that are settled to materials are posted with a constant price throughout the period. The valuation strategy is invalidated inasmuch as a price is calculated according to the strategy only for the first activity allocation. For all subsequent allocations, the constant price is used, even if the strategy would dictate otherwise.

The update settings can only be used together with Actual Costing.

Data can not be updated correctly if the setting changes within the period. (price determination would generate incorrect debits to materials)

Dependencies

If you activate activity consumption update in the quantity structure with the with (Activity update relevant to price determination), the differences for the cost centers/processes are subsequently debited to the relevant material. Therefore, if you activate the activity consumption update in the quantity structure with setting '2', you cannot complete the step 'revaluate actual prices' during period closing for Cost Object Controlling as this would subsequently debit the material twice.

History
Last changed by/on SAP  19990312 
SAP Release Created in