SAP ABAP Data Element CKEK_REFERENCE_CALCULATION (Transfer Cost Estimate as Original)
Hierarchy
☛
SAP_FIN (Software Component) SAP_FIN
⤷
CO-PC-PCP (Application Component) Product Cost Planning
⤷
CKEK (Package) Multilevel Unit/Simulation Costing

⤷

⤷

Basic Data
Data Element | CKEK_REFERENCE_CALCULATION |
Short Description | Transfer Cost Estimate as Original |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | CHAR1 | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Reference |
Medium | 18 | Cost est as orignl |
Long | 29 | Transfer cost est as original |
Heading | 29 | Transfer cost est as original |
Documentation
Definition
Specifies that the cost estimate is transferred as the original
Example
If you want to transfer a substructure from the worklist into the costing structure, you can specify for each cost estimate that the substructure is to be transferred as the original, even if the highest node of the substructure is copied.
History
Last changed by/on | SAP | 19990526 |
SAP Release Created in |