Hierarchy
⤷ CO-PC-PCP (Application Component) Product Cost Planning
⤷ CKJ1 (Package) Customizing for Product Costing
Basic Data
Data Element | CK_UERBERNAHME_ERR |
Short Description | Transfer Active Std Cost Est. if Material Costed with Errors |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | XFELD | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | TransError |
Medium | 20 | Transfer if Errors |
Long | 39 | Use Active Std Cost Est if Mat. Errors |
Heading | 70 | Transfer Active Std Cost Est. if Mat. Costed w/Errors |
Documentation
Definition
Indicator that tells the system to find the active standard cost estimate when materials have errors, and continue costing.
Use
If you cost a material with a BOM, the system first explodes the BOM and then costs the materials, level by level, in the structure. The costs are rolled up. If a material in this BOM is costed with errors, it receives the status KF (costed with errors). This status is passed on up to the highest material.
Procedure
If you set this indicator, then when materials are costed with errors, the system searches for the active standard cost estimate and uses the cost component split of that estimate to continue costing up to the highest material. If the system cannot find an active standard cost estimate for the material with errors in the structure, it searches for a price in the material master in accordance with the valuation variant, and uses the price for costing.
If you do not set this indicator, the price for the material is taken from the material master in accordance with the valuation variant.
In this way, the cost estimate for the header material receives the status KA (costed without errors), even though a material in the structure was costed with errors.
Examples
Dependencies
This indicator does not apply to the preliminary costing of product cost collectors.
History
Last changed by/on | SAP | 19970812 |
SAP Release Created in |