SAP ABAP Data Element CK_UEBID (Transfer Control)
Hierarchy
☛
SAP_FIN (Software Component) SAP_FIN
⤷ CO-PC-PCP (Application Component) Product Cost Planning
⤷ CKJ1 (Package) Customizing for Product Costing
⤷ CO-PC-PCP (Application Component) Product Cost Planning
⤷ CKJ1 (Package) Customizing for Product Costing
Basic Data
Data Element | CK_UEBID |
Short Description | Transfer Control |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | CK_UEBER | |
Data Type | CHAR | Character String |
Length | 4 | |
Decimal Places | 0 | |
Output Length | 4 | |
Value Table | TCK24 |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | TCID |
Medium | 18 | Transfer Control |
Long | 20 | Transfer Control |
Heading | 20 | Transfer Control |
Documentation
Definition
This controls how costing with quantity structure searches for existing cost estimates when existing costing data are transferred to another cost estimate.
Use
In costing with quantity structure, the costs are usually calculated for a multilevel assembly structure. Cost estimates may already exist for some of the costing levels.
You can define single-plant and cross-plant strategies to control which cost estimate is transferred to the higher costing level.
- The single-plant strategy prevents the assemblies in the production structure from being recosted.
- With the cross-plant strategy, you control whether costing data for specially procured materials is to be transferred from the other plant.
Procedure
Examples
Dependencies
You assign this key to a costing variant.
History
Last changed by/on | SAP | 19970812 |
SAP Release Created in |