SAP ABAP Data Element CK_LOBEZUS (Overhead on Subcontracted Materials)
Hierarchy
☛
SAP_FIN (Software Component) SAP_FIN
⤷ CO-PC-PCP (Application Component) Product Cost Planning
⤷ CKJ1 (Package) Customizing for Product Costing
⤷ CO-PC-PCP (Application Component) Product Cost Planning
⤷ CKJ1 (Package) Customizing for Product Costing
Basic Data
Data Element | CK_LOBEZUS |
Short Description | Overhead on Subcontracted Materials |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | XFELD | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 7 | LOBEZUS |
Medium | 20 | Overhead Subcon Mat. |
Long | 29 | Overhead on Subcon. Materials |
Heading | 45 | Overhead on Subcontracted Materials |
Documentation
Definition
Indicator specifying whether, in respect of materials subject to subcontracting, overhead is applied in accordance with the costing sheet in the valuation variant.
Use
Set this indicator if you want to apply overhead to subcontracted materials (for example, to include material and administrative overhead).
Note
The application of overhead to subcontracted materials is included in material costing as well in unit costing on a manual basis for any subcontracting items entered.
Dependencies
When a material cost estimate is transferred to a unit cost estimate, items are flagged as Do not apply overhead if the indicator is not set in the valuation variant of the receiving object.
History
Last changed by/on | SAP | 19970812 |
SAP Release Created in |