SAP ABAP Data Element CK_KDFSCHD (Pass On Costing Sheet)
Hierarchy
SAP_FIN (Software Component) SAP_FIN
   CO-PC-PCP (Application Component) Product Cost Planning
     CKJ1 (Package) Customizing for Product Costing
Basic Data
Data Element CK_KDFSCHD
Short Description Pass On Costing Sheet  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type XFELD    
Data Type CHAR   Character String 
Length 1    
Decimal Places 0    
Output Length 1    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 KDFSCHD 
Medium 18 Costing Sheet 
Long 31 Pass On Costing Sheet 
Heading 49 Pass On Costing Sheet 
Documentation

Definition

Specifies that, in sales order costing, the calculation of overhead for the semi-finished products (individual requirements) that go into the finished product listed in the sales order item, is carried out in the costing sheet specified in the sales order item. This ensures that the conditions for overhead calculation are specific to the sales order.

Use

If this indicator is not set, the overhead for these materials is calculated in the costing sheet specified in the valuation variant in the costing variant.

Dependencies

For the finished product listed in the sales order item, the overhead is always calculated in the costing sheet specified in the sales order item.

If you set this indicator, you should make sure that, in actuals, overhead for the production orders assigned to the sales order is calculated by means of the indicator in the sales order item. You do this by setting the indicator Copy costing sheet in the requirements class.

When using nonvaluated sales order stocks, overhead calculation is also influenced by the indicator Overhead only for raw materials for sales order in the costing type.

For more information about passing on the costing sheet, see the Product Cost by Sales Order section of the SAP Library.

Supplementary Documentation - CK_KDFSCHD0001

Use in Production Lot Costing

Specifies that, in production lot costing, overhead for semi-finished products that go into the finished product is calculated using the costing sheet entered in the production lot.

If this indicator is not set, the system uses the costing sheet from the valuation variant entered in the costing variant.

History
Last changed by/on SAP  19980428 
SAP Release Created in