Hierarchy
⤷ CO-PC-PCP (Application Component) Product Cost Planning
⤷ CKJ1 (Package) Customizing for Product Costing
Basic Data
Data Element | CK_KDFSCHD |
Short Description | Pass On Costing Sheet |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | XFELD | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | KDFSCHD |
Medium | 18 | Costing Sheet |
Long | 31 | Pass On Costing Sheet |
Heading | 49 | Pass On Costing Sheet |
Documentation
Definition
Specifies that, in sales order costing, the calculation of overhead for the semi-finished products (individual requirements) that go into the finished product listed in the sales order item, is carried out in the costing sheet specified in the sales order item. This ensures that the conditions for overhead calculation are specific to the sales order.
Use
If this indicator is not set, the overhead for these materials is calculated in the costing sheet specified in the valuation variant in the costing variant.
Dependencies
For the finished product listed in the sales order item, the overhead is always calculated in the costing sheet specified in the sales order item.
If you set this indicator, you should make sure that, in actuals, overhead for the production orders assigned to the sales order is calculated by means of the indicator in the sales order item. You do this by setting the indicator Copy costing sheet in the requirements class.
When using nonvaluated sales order stocks, overhead calculation is also influenced by the indicator Overhead only for raw materials for sales order in the costing type.
For more information about passing on the costing sheet, see the Product Cost by Sales Order section of the SAP Library.
Supplementary Documentation - CK_KDFSCHD0001
Use in Production Lot Costing
Specifies that, in production lot costing, overhead for semi-finished products that go into the finished product is calculated using the costing sheet entered in the production lot.
If this indicator is not set, the system uses the costing sheet from the valuation variant entered in the costing variant.
History
Last changed by/on | SAP | 19980428 |
SAP Release Created in |