SAP ABAP Data Element CK_FR_PROC (Process Data Frame)
Hierarchy
☛
SAP_FIN (Software Component) SAP_FIN
⤷ CO-PC-PCP (Application Component) Product Cost Planning
⤷ CKBA (Package) Procurement Alternatives and Mixing Ratios for Mixed Costing
⤷ CO-PC-PCP (Application Component) Product Cost Planning
⤷ CKBA (Package) Procurement Alternatives and Mixing Ratios for Mixed Costing
Basic Data
Data Element | CK_FR_PROC |
Short Description | Process Data Frame |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | CHAR30 | |
Data Type | CHAR | Character String |
Length | 30 | |
Decimal Places | 0 | |
Output Length | 30 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Process |
Medium | 15 | Process |
Long | 20 | Process Data |
Heading | 0 |
Supplementary Documentation - CK_FR_PROCESS0001
Use in material costing with quantity structure
In this area, you can do the following:
- execute the steps of the costing run (see Change parameters and Executing the editing step)
- display information on the editing steps of the costing run, see:
Editing the costing run entails carrying out the following steps:
- Material selection
- Structure explosion
- Costing
- Generate report
- Update of the standard price in the material master:
or
- Update of other prices
- tax-based and commercial prices 1, 2, and 3
- Planned prices 1, 2, and 3
Note
The costing type specifies whether and which prices are updated in the material master. The costing type is assigned to the costing variant.
The steps Marking/Release and Price update are offereddepending on what has been determined in the costing type:
- If the costing type does not allow for price update, this step is not offered in the costing run.
- If the costing type allows for the update of standard prices, the steps Marking and Release are offered.
- If the costing type allows for the update of other prices (planned prices, tax-based and commercial prices), the step Price update is offered.
History
Last changed by/on | SAP | 19980505 |
SAP Release Created in |