SAP ABAP Data Element CK_ERZKALKULATION (Cost Estimate Is Cost Estimate with Quantity Structure)
Hierarchy
☛
SAP_FIN (Software Component) SAP_FIN
⤷ CO-PC-PCP (Application Component) Product Cost Planning
⤷ CKJ4 (Package) Price Update (Product Costing)
⤷ CO-PC-PCP (Application Component) Product Cost Planning
⤷ CKJ4 (Package) Price Update (Product Costing)
Basic Data
Data Element | CK_ERZKALKULATION |
Short Description | Cost Estimate Is Cost Estimate with Quantity Structure |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | CHAR2 | |
Data Type | CHAR | Character String |
Length | 2 | |
Decimal Places | 0 | |
Output Length | 2 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | With QS |
Medium | 16 | With Qty Struct. |
Long | 28 | Cost Est. with Qty Structure |
Heading | 28 | Cost Est. with Qty Structure |
Documentation
Definition
Indicates how the material was valuated.
Use
If this indicator is set, the material was valuated with a cost estimate with quantity structure.
If this indicator is not set, the material was valuated with a cost estimate without quantity structure.
History
Last changed by/on | SAP | 19980617 |
SAP Release Created in |