SAP ABAP Data Element CK_ERZKALKULATION (Cost Estimate Is Cost Estimate with Quantity Structure)
Hierarchy
☛
SAP_FIN (Software Component) SAP_FIN
⤷
CO-PC-PCP (Application Component) Product Cost Planning
⤷
CKJ4 (Package) Price Update (Product Costing)
⤷
⤷
Basic Data
| Data Element | CK_ERZKALKULATION |
| Short Description | Cost Estimate Is Cost Estimate with Quantity Structure |
Data Type
| Category of Dictionary Type | D | Domain |
| Type of Object Referenced | No Information | |
| Domain / Name of Reference Type | CHAR2 | |
| Data Type | CHAR | Character String |
| Length | 2 | |
| Decimal Places | 0 | |
| Output Length | 2 | |
| Value Table |
Further Characteristics
| Search Help: Name | ||
| Search Help: Parameters | ||
| Parameter ID | ||
| Default Component name | ||
| Change document | ||
| No Input History | ||
| Basic direction is set to LTR | ||
| No BIDI Filtering |
Field Label
| Length | Field Label | |
| Short | 10 | With QS |
| Medium | 16 | With Qty Struct. |
| Long | 28 | Cost Est. with Qty Structure |
| Heading | 28 | Cost Est. with Qty Structure |
Documentation
Definition
Indicates how the material was valuated.
Use
If this indicator is set, the material was valuated with a cost estimate with quantity structure.
If this indicator is not set, the material was valuated with a cost estimate without quantity structure.
History
| Last changed by/on | SAP | 19980617 |
| SAP Release Created in |