SAP ABAP Data Element CK_BWSTRAT (Price for Activity Valuation)
Hierarchy
☛
SAP_FIN (Software Component) SAP_FIN
⤷ CO-PC-ACT-PER (Application Component) Periodic Material Valuation
⤷ CKMLCUMREV (Package) no longer used, is now CO_ML_AVR
⤷ CO-PC-ACT-PER (Application Component) Periodic Material Valuation
⤷ CKMLCUMREV (Package) no longer used, is now CO_ML_AVR
Basic Data
Data Element | CK_BWSTRAT |
Short Description | Price for Activity Valuation |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | BWSTRAT | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Price |
Medium | 15 | Price |
Long | 20 | Price for Act.Val. |
Heading | 0 |
Documentation
Definition
Indicates which price is used for valuation of the consumption of activities and business processes.
If the plan activity price is used, the specified CO versions (plan versions and the plan activity price) must be correspondingly iterated.
If the actual activity price is used, price calculation must be triggered from the cockpit of cumulation. Correspondingly, the specified versions must be actual versions. Revaluation of the cost centers must be deactivated.
History
Last changed by/on | SAP | 20130529 |
SAP Release Created in |