Hierarchy
⤷ CO-PC-PCP (Application Component) Product Cost Planning
⤷ CKJ3 (Package) Archiving and Reorganization in Product Costing
Basic Data
Data Element | CK_BIDATUM |
Short Description | Interval for Costing Date To |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | CK_KADAT | |
Data Type | DATS | Date field (YYYYMMDD) stored as char(8) |
Length | 8 | |
Decimal Places | 0 | |
Output Length | 10 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | ToDate |
Medium | 20 | Costing Date To |
Long | 37 | Interval for Costing Date To |
Heading | 37 | Interval for Costing Date To |
Documentation
Definition
Interval for Costing Date To.
When you enter this interval, you select all the cost estimates whose Costing Date To falls within it.
Example
Validity dates of the cost estimates:
(cost estimate 1) [----------------------]
(cost estimate 2) [----------------]
(cost estimate 3) [-----------------------------------]
-------------------------------------------------------------------->
Time
a) (interval for valid to) |-------|
b) (interval for valid to) |------------------------|
c) (Interval for valid to) |-------------|
Description
The above diagram shows three cost estimates that are each valid for a specific period of time. These periods begin with the Costing Date From and end with the Costing Date To.
Interval a) would select cost estimates 2 and 3.
Interval b) would select cost estimates 1, 2 and 3.
Interval c) would not select any cost estimates.
History
Last changed by/on | SAP | 19970812 |
SAP Release Created in |