Hierarchy
⤷ CO-PC-PCP (Application Component) Product Cost Planning
⤷ CKJ3 (Package) Archiving and Reorganization in Product Costing
Basic Data
Data Element | CK_ABDATUM |
Short Description | Interval for Costing Date From |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | CK_KADAT | |
Data Type | DATS | Date field (YYYYMMDD) stored as char(8) |
Length | 8 | |
Decimal Places | 0 | |
Output Length | 10 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 8 | FromDate |
Medium | 19 | Costing Date From |
Long | 20 | Costing Date From |
Heading | 36 | Interval for Costing Date From |
Documentation
Definition
Interval for Costing Date From.
When you enter this interval, you select all the cost estimates whose Costing Date From fall within it.
Example
Validity dates of the cost estimates:
[----------------------] (cost estimate 1)
[----------------] (cost estimate 2)
[-----------------------------------] (cost estimate 3)
-------------------------------------------------------------------->
Time
|----| a) (interval for 'valid from')
|----------| b) (interval for 'valid from')
|---------| c) (interval for 'valid from')
Description
The above diagram shows three cost estimates that are each valid for a specific period of time. These time periods begin with the Costing Date From and end with the Costing Date To.
Interval a) would select cost estimates 2 and 3.
Interval b) would select cost estimates 1, 2 and 3.
Interval c) would not select any cost estimates.
History
Last changed by/on | SAP | 19970812 |
SAP Release Created in |