SAP ABAP Data Element CIFSNPPLAF (Create SNP Planned Order at Transfer of Planned Orders)
Hierarchy
☛
SAP_APPL (Software Component) Logistics and Accounting
⤷ SCM-BAS (Application Component) SCM Basis
⤷ CIF (Package) Core Interface
⤷ SCM-BAS (Application Component) SCM Basis
⤷ CIF (Package) Core Interface
Basic Data
Data Element | CIFSNPPLAF |
Short Description | Create SNP Planned Order at Transfer of Planned Orders |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | XFELD | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | SNP Pl.Ord |
Medium | 16 | SNP Plan. Orders |
Long | 20 | SNP Planned Orders |
Heading | 16 | SNP Plan. Orders |
Documentation
Definition
Controls the generation of SNP planned orders in SAP APO during the initial supply from the ERP system.
Use
If you set this indicator, SAP APO creates SNP planned orders during the initial supply of planned orders from the ERP system, assuming that the following prerequisites are met:
- You are using SAP APO 4.0 or higher.
- The planned order is contained in an active integration model for planned orders.
- The planned order does not already exist in SAP APO.
- The MRP procedure X (without MRP, with BOM explosion) is assigned to the header material of the planned order in the ERP system.
- The availability date/time of the header material lies outside the SNP production horizon. The SNP production horizon is the period of time during which Supply Network Planning (SNP) does not plan production, in other words, does not create any SNP planned orders. SNP shifts production to the first day after this horizon.
- The planned order is neither a planned order of type VP (forecast) nor a planned order for project stock or sales order stock.
- An SNP production horizon or an SNP production horizon enhancement greater than zero has been maintained in SAP APO in the product master (transaction /SAPAPO/MAT1) on the SNP 2 tab page.
Orders that exist already in SAP APO are not converted to a different type if you set this indicator.
If you do not set this indicator, the planned orders transferred from the ERP system are always created in SAP APO as PP/DS planned orders.
For more information about controlling planned order integration, see the SAP APO Implementation Guide for Supply Network Planning (SNP) under Basic Settings -> Maintain Global SNP Settings.
Dependencies
Example