SAP ABAP Data Element CIFRESCHED (Rescheduling after Quantity Adjustment via Confirmation)
Hierarchy
SAP_APPL (Software Component) Logistics and Accounting
   SCM-BAS (Application Component) SCM Basis
     CIF (Package) Core Interface
Basic Data
Data Element CIFRESCHED
Short Description Rescheduling after Quantity Adjustment via Confirmation  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type CIFRESCHED    
Data Type CHAR   Character String 
Length 1    
Decimal Places 0    
Output Length 1    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 Reschedule 
Medium 15 Rescheduling 
Long 36 Rescheduling after Qty Adjustment 
Heading 36 Rescheduling after Qty Adjustment 
Documentation

Definition

For a confirmation, an adjustment of quantities is carried out for subsequent operations and components. This setting can be used to control whether the order should subsequently be rescheduled in the ERP system in order to adjust the order deadlines to the changed operation durations.

Note

If you are using SAP APO and carry out capacity planning there, you can also start the rescheduling of confirmed orders using a recent optimization run in SAP APO.

History
Last changed by/on SAP  20030325 
SAP Release Created in