Hierarchy
⤷ SCM-BAS (Application Component) SCM Basis
⤷ CIF (Package) Core Interface
Basic Data
Data Element | CIFPPMSEL |
Short Description | Selection Date for PPM Updating |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | CIFPPMSEL | |
Data Type | NUMC | Character string with only digits |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | PPM Selecn |
Medium | 19 | PPM Selection Date |
Long | 33 | Selection Date for PPM Updating |
Heading | 33 | Selection Date for PPM Updating |
Documentation
Definition
For the creation of production process models (PPMs) in SAP APO, BOMs and routing or recipes from the production version of the material master are exploded and converted in the ERP system into the corresponding PPM structures. This explosion occurs with reference to key date, so that for a production version in the ERP system there can only be one validity period for BOMs and routing in the SAP APO PPM. Using this indicator you can control with which date the BOM and routing explosion occurs in the ERP system.
There are 4 possibilities to choose from:
- Explosion according the selection date entered
- Explosion according to the time of transfer
- Explosion according to start date of the production version
- Explosion according to end date of the production version
If you use different validity periods in your BOMs or routing and wish to map these validity periods in SAP APO, you have to generate one validity period per production version and include this in your integration model.
History
Last changed by/on | SAP | 20030325 |
SAP Release Created in |