SAP ABAP Data Element CIFNONEWSCHEDULING (No Rescheduling of Stock Transport Orders)
Hierarchy
☛
SAP_APPL (Software Component) Logistics and Accounting
⤷
SCM-BAS (Application Component) SCM Basis
⤷
CIF8 (Package) CIF8
⤷
⤷
Basic Data
| Data Element | CIFNONEWSCHEDULING |
| Short Description | No Rescheduling of Stock Transport Orders |
Data Type
| Category of Dictionary Type | D | Domain |
| Type of Object Referenced | No Information | |
| Domain / Name of Reference Type | XFELD | |
| Data Type | CHAR | Character String |
| Length | 1 | |
| Decimal Places | 0 | |
| Output Length | 1 | |
| Value Table |
Further Characteristics
| Search Help: Name | ||
| Search Help: Parameters | ||
| Parameter ID | ||
| Default Component name | ||
| Change document | ||
| No Input History | ||
| Basic direction is set to LTR | ||
| No BIDI Filtering |
Field Label
| Length | Field Label | |
| Short | 10 | No Resch. |
| Medium | 17 | No Resched. STOs |
| Long | 30 | No Rescheduling of STO |
| Heading | 40 | No Rescheduling of Stock Transp. Orders |
Documentation
Definition
Use
If you set this indicator, SAP APO does not reschedule stock transport orders after they have been transferred. Instead, SAP APO adopts the dates/times of the stock transport orders from the ERP system.
SAP APO adopts the following dates/times from the ERP system:
- Material staging date as the goods issue start date/time
- Goods issue date as the goods issue end date/time and the transportation start date/time
- Delivery date as the transportation end date/time and the goods receipt start date
- Delivery end date as the goods receipt end date/time
Dependencies
This indicator only applies to stock transport orders and not to standard purchase orders, standard purchase requisitions, or stock transport requisitions.
- Capacities must be planned infinitely.
- If rescheduling is suppressed, SAP SCM only takes into account resources in SNP stock transfers. The resources in all other transfer orders are not taken into account.
- If rescheduling is suppressed, in SAP APO, the goods issue end date/time is the same as the transportation start date/time, and the transportation end date/time is the same as goods receipt start date/time.
Example
History
| Last changed by/on | SAP | 20050411 |
| SAP Release Created in | 600 |