SAP ABAP Data Element CHCL_DATE (Planned Conversion Date for Batch Class)
Hierarchy
☛
EA-APPL (Software Component) SAP Enterprise Extension PLM, SCM, Financials
⤷
LO-BM (Application Component) Batches
⤷
VBCR (Package) Batch Class Conversion
⤷
⤷
Basic Data
| Data Element | CHCL_DATE |
| Short Description | Planned Conversion Date for Batch Class |
Data Type
| Category of Dictionary Type | D | Domain |
| Type of Object Referenced | No Information | |
| Domain / Name of Reference Type | DATS | |
| Data Type | DATS | Date field (YYYYMMDD) stored as char(8) |
| Length | 8 | |
| Decimal Places | 0 | |
| Output Length | 10 | |
| Value Table |
Further Characteristics
| Search Help: Name | ||
| Search Help: Parameters | ||
| Parameter ID | ||
| Default Component name | ||
| Change document | ||
| No Input History | ||
| Basic direction is set to LTR | ||
| No BIDI Filtering |
Field Label
| Length | Field Label | |
| Short | 10 | Conv. Date |
| Medium | 15 | Conversion Date |
| Long | 25 | Planned Conversion Date |
| Heading | 15 | Conversion Date |
Documentation
Definition
The time at which a conversion should be processed using background processing.
Use
When you start report RVBCR_CLASS_REPLACE, the system processes those conversions whose planned conversion date
- is the same as today's date
or
- is in the past.
If you do not enter a date, the conversion is processed when you next run the report.
History
| Last changed by/on | SAP | 20110901 |
| SAP Release Created in | 50A |