SAP ABAP Data Element CEPRIORITY (Cost Estimate Priority)
Hierarchy
☛
ECC-DIMP (Software Component) DIMP
⤷
IS-EC-BOS (Application Component) Customer Bill of Services
⤷
AD_BOS_03 (Package) BOS: Objects with English as Original Language

⤷

⤷

Basic Data
Data Element | CEPRIORITY |
Short Description | Cost Estimate Priority |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | CHAR1 | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | CE Tfr |
Medium | 20 | Cost Estimate Tfr |
Long | 25 | Cost Estimate Transfer |
Heading | 0 |
Documentation
Definition
Selection priority for the cost transfer to project in batch processing.
Use
The transfer of the service line cost estimate has higher priority.
- If the reference points for the cost estimate transfer of a service line match, the system transfers the service line cost estimate. This transfer is irrespective of whether the reference points for the transfer of individual costing items (which belong to the matching service line) also match.
- If the reference points for the transfer of a costing item match, but the reference points for the cost estimate transfer of the corresponding service line do not match, the system transfers only the suitable costing item to the WBS element.
Examples
Dependencies
History
Last changed by/on | SAP | 20050301 |
SAP Release Created in | 46C2 |