SAP ABAP Data Element CCRCE_FLG_DELTA (Delta Run)
Hierarchy
☛
EA-APPL (Software Component) SAP Enterprise Extension PLM, SCM, Financials
⤷
EHS-SAF (Application Component) Product Safety
⤷
CBRC (Package) EHS: Substance-Related Regulation Checks

⤷

⤷

Basic Data
Data Element | CCRCE_FLG_DELTA |
Short Description | Delta Run |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | ESDBOOLE | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Delta Run |
Medium | 20 | Delta Run |
Long | 30 | Delta Run |
Heading | 30 | Delta Run |
Documentation
Definition
Causes the report to be started as a delta run.
Use
- The following occurs if you set this indicator when you start report RREGCH_VT or in a variant for background processing of this report:
- The system reads the date and time of the completed report run for the selected regulation and scenario from table CCRCT_RUN, and uses these values as the start date and time for data selection.
All new or changed documents afer this time are read. The validity date used for substance volume tracking is the posting date for confirmed quantities. For planned quantities, the date depends on the scenario. For example, if a purchase order item is changed within the specified period, it is written to the monitoring table with the delivery date and thereby assigned to the period and year of the delivery date for tracking purposes. - The system uses the current date, and the current time minus 30 minutes as the default end date and time for data selection. This prevents problems that could be caused by material documents that are created during the run overlapping.
The 30 minute time difference can be changed using environment parameter SVT_TRACKING_DIFF_TIME. The value specifies the time allowed between the database commit and determination of the change time-point for the material document. The material document is not tracked if the difference between these two time points exceeds the specified time difference. - The system ignores values entered under Initial Run.
- The following occurs if you set this indicator when you start report RREGCH_FILL or in a variant used for the background processing of this report:
- The system reads the date of the last report run for the selected regulation and scenario from the environment parameters, and uses this date as the start date for data selection.
Dependencies
History
Last changed by/on | SAP | 20100310 |
SAP Release Created in | 46C |