SAP ABAP Data Element CCPRIORITY (Costing Item Priority)
Hierarchy
☛
ECC-DIMP (Software Component) DIMP
⤷
IS-EC-BOS (Application Component) Customer Bill of Services
⤷
AD_BOS_03 (Package) BOS: Objects with English as Original Language

⤷

⤷

Basic Data
Data Element | CCPRIORITY |
Short Description | Costing Item Priority |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | CHAR1 | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | CI Tfr |
Medium | 20 | Costing Item Transfr |
Long | 25 | Costing Item Transfer |
Heading | 0 |
Documentation
Definition
Selection priority for the cost transfer to project in batch processing.
Use
The transfer of the costing item has higher priority.
- If the reference points for the transfer of a costing item match, the system transfers the costing item to the WBS element. This transfer is irrespective of whether the reference points for cost estimate transfer of this service line match or not. In both cases, the service line cost estimate is not even transferred once.
- If the reference points for the transfer of a service line cost estimate match, but the reference points for the transfer of the costing items (which belong to this service line) do not match, the system transfers the cost estimate.
Examples
Dependencies
History
Last changed by/on | SAP | 20050301 |
SAP Release Created in | 46C2 |