SAP ABAP Data Element CCIHE_PSTDAT (Planned Start Date)
Hierarchy
☛
EA-APPL (Software Component) SAP Enterprise Extension PLM, SCM, Financials
⤷ EHS-IHS (Application Component) Industrial Hygiene and Safety
⤷ CBIH (Package) EH&S: Industrial Hygiene and Safety
⤷ EHS-IHS (Application Component) Industrial Hygiene and Safety
⤷ CBIH (Package) EH&S: Industrial Hygiene and Safety
Basic Data
Data Element | CCIHE_PSTDAT |
Short Description | Planned Start Date |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | DATUM | |
Data Type | DATS | Date field (YYYYMMDD) stored as char(8) |
Length | 8 | |
Decimal Places | 0 | |
Output Length | 10 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | PLANNED_START_DATE | |
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Start date |
Medium | 15 | Planned start |
Long | 20 | Planned start date |
Heading | 10 | Plan start |
Documentation
Use
You can specify the date on which the safety measure or task is to be started.
Dependencies
If you transfer the safety measure to Plant Maintenance (PM processing) as part of a maintenance notification and the date is changed there, your original entry will be updated when the task (safety measure) is read back from PM.
Notes:
- Whether safety measures can be transferred to PM processing depends on the Customizing for the safety measure category. As standard, the link is set for technical safety measures.
- You will find detailed information on reading tasks back from PM in the documentation for the report program REHS_GET_ACTIONS_FROM_PM.
History
Last changed by/on | SAP | 20100310 |
SAP Release Created in |