SAP ABAP Data Element CCIHE_PENDTIME (Planned End Time of Safety Measure)
Hierarchy
☛
EA-APPL (Software Component) SAP Enterprise Extension PLM, SCM, Financials
⤷ EHS-IHS (Application Component) Industrial Hygiene and Safety
⤷ CBIH (Package) EH&S: Industrial Hygiene and Safety
⤷ EHS-IHS (Application Component) Industrial Hygiene and Safety
⤷ CBIH (Package) EH&S: Industrial Hygiene and Safety
Basic Data
Data Element | CCIHE_PENDTIME |
Short Description | Planned End Time of Safety Measure |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | TIME | |
Data Type | TIMS | Time field (hhmmss), stored as char(6) |
Length | 6 | |
Decimal Places | 0 | |
Output Length | 8 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | PLANNED_END_TIME | |
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | End Time |
Medium | 15 | Plan. end time |
Long | 20 | Planned end time |
Heading | 8 | Plan end |
Documentation
Use
You can enter the time by which the safety measure should be completed.
Dependencies
If you transfer the safety measure to Plant Maintenance (PM processing) as part of a maintenance notification and the time is changed there, your original entry will be updated when the task (safety measure) is read back from PM.
Notes:
- Whether safety measures can be transferred to PM processing depends on the Customizing for the safety measure category. As standard, the link is set for technical safety measures.
- You will find detailed information on reading tasks back from PM in the documentation for the report program REHS_GET_ACTIONS_FROM_PM.
History
Last changed by/on | SAP | 20110901 |
SAP Release Created in |