SAP ABAP Data Element CCDOK_MIFR (Change number with release)
Hierarchy
☛
SAP_ABA (Software Component) Cross-Application Component
⤷ CA-GTF-ECM (Application Component) Engineering Change Management
⤷ CC (Package) Engineering Change Management
⤷ CA-GTF-ECM (Application Component) Engineering Change Management
⤷ CC (Package) Engineering Change Management
Basic Data
Data Element | CCDOK_MIFR |
Short Description | Change number with release |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | XFELD | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 0 | |
Medium | 0 | |
Long | 0 | |
Heading | 0 |
Documentation
Definition
Determines that the changes made with reference to the change master are released by a (release key) for the operative areas (costing, planning, production).
Use
Procedure
Examples
By using the release key, you can determine that BOM changes with reference to the change master record N-1 are only released for costing and not for planning or production.
Dependencies
Supplementary Documentation - CCDOK_MIFR0010
Use
Procedure
Enter this indicator if you want to archive change master records, that were created with the function With release key.
Examples
Dependencies
History
Last changed by/on | SAP | 20020827 |
SAP Release Created in |